Details
BUY BUF460AV https://www.utsource.net/itm/p/12376764.html
| Parameter | Symbol | Min | Typ | Max | Unit | Description |
|---|---|---|---|---|---|---|
| Supply Voltage | VCC | 4.5 | 5.0 | 5.5 | V | Operating supply voltage |
| Input Voltage Range | VI | 0 | - | VCC | V | Input voltage range |
| Output Voltage Range | VO | 0 | - | VCC - 0.3 | V | Output voltage range |
| Input Leakage Current | IIL | -1 | 0 | 1 | μA | Maximum input leakage current |
| Output Short-Circuit Current | IOS | - | 25 | - | mA | Continuous output short-circuit current |
| Propagation Delay Time | tpd | - | 12 | 18 | ns | Propagation delay time |
| Power Dissipation | PD | - | - | 150 | mW | Maximum power dissipation per package |
| Operating Temperature | TA | -40 | - | 85 | °C | Operating temperature range |
| Storage Temperature | TSTG | -65 | - | 150 | °C | Storage temperature range |
Instructions for Using BUF460AV
Power Supply:
- Ensure the supply voltage (VCC) is within the specified range of 4.5V to 5.5V.
- Connect the VCC pin to the positive supply and the GND pin to the ground.
Input Signals:
- The input voltage (VI) should be within the range of 0V to VCC.
- Avoid applying voltages outside this range to prevent damage to the device.
Output Signals:
- The output voltage (VO) will be between 0V and VCC - 0.3V.
- Ensure that the load connected to the output does not exceed the maximum output short-circuit current of 25mA.
Propagation Delay:
- The typical propagation delay time (tpd) is 12ns with a maximum of 18ns.
- Account for this delay when designing timing-sensitive circuits.
Thermal Management:
- The maximum power dissipation (PD) is 150mW.
- Ensure adequate heat sinking or cooling if operating near the maximum power dissipation.
Temperature Considerations:
- The operating temperature range (TA) is from -40°C to 85°C.
- The storage temperature range (TSTG) is from -65°C to 150°C.
- Store the device in a dry environment to avoid moisture damage.
Handling:
- Handle the device with care to avoid static discharge, which can damage the internal components.
- Use proper ESD protection measures during handling and installation.
Testing:
- Before integrating the BUF460AV into your design, test it under the specified conditions to ensure it meets the required performance parameters.
View more about BUF460AV on main site
