BUK9Y19-55B/DS

BUK9Y19-55B/DS


Specifications
SKU
12596505
Details

BUY BUK9Y19-55B/DS https://www.utsource.net/itm/p/12596505.html

Parameter Symbol Min Typical Max Unit Notes
Continuous Drain Current ID - 42 - A @ Tc = 25掳C, VGS = 10V, tD = 1s
Pulse Drain Current Ipp - 126 - A @ Tc = 25掳C, VGS = 10V, tpp = 100渭s, duty cycle = 1%
Drain-Source Voltage VDS - - 55 V
Gate-Source Voltage VGS -20 - 15 V
Gate Charge QG - 88 - nC @ VDS = 55V, VGS = 10V, ID = 1A
Input Capacitance Ciss - 3750 - pF @ VDS = 55V, VGS = 0V
Output Capacitance Coss - 750 - pF @ VDS = 55V, VGS = 0V
Reverse Transfer Capacitance Crss - 1150 - pF @ VDS = 55V, VGS = 0V
RDS(on) RDS(on) - 4.5 - m惟 @ VGS = 10V, ID = 42A, Tc = 25掳C
Total Power Dissipation PD - - 220 W @ Tc = 25掳C
Junction Temperature TJ -20 - 175 掳C
Storage Temperature Tstg -55 - 150 掳C

Instructions for Use:

  1. Mounting and Handling:

    • Ensure proper handling to avoid damage to the device.
    • Use appropriate heat sinks to manage thermal dissipation.
  2. Electrical Connections:

    • Connect the drain (D) to the high-voltage side of the circuit.
    • Connect the source (S) to the low-voltage side or ground.
    • Apply the gate (G) voltage relative to the source to control the MOSFET.
  3. Operating Conditions:

    • Do not exceed the maximum ratings specified in the table.
    • Ensure the junction temperature does not exceed 175掳C.
    • For continuous operation, keep the drain current within the rated limits.
  4. Thermal Management:

    • Use a heatsink with adequate thermal resistance to maintain the junction temperature within safe limits.
    • Consider forced air cooling or other cooling methods for high-power applications.
  5. Gate Drive:

    • Use a gate driver circuit to provide the necessary gate voltage.
    • Ensure the gate voltage is within the specified range to avoid damage or improper operation.
  6. Storage:

    • Store the device in a dry, cool place to prevent moisture damage.
    • Handle with ESD precautions to avoid static discharge damage.
  7. Testing:

    • Perform initial testing at lower power levels to ensure proper operation before full-scale deployment.
    • Monitor temperature and performance during testing to ensure reliability.
(For reference only)

View more about BUK9Y19-55B/DS on main site