Details
BUY BTA12-400C https://www.utsource.net/itm/p/12610630.html
| Parameter | Symbol | Min | Typ | Max | Unit | Conditions |
|---|---|---|---|---|---|---|
| RMS On-State Current | IT(RMS) | - | 12 | - | A | Tj = 25掳C |
| Peak On-State Current | ITSM | - | 60 | - | A | Tj = 25掳C, t = 10 ms, Duty < 1% |
| Repetitive Peak Off-State Voltage | VDRM | 400 | - | - | V | I = 0, Tj = 25掳C |
| Non-Repetitive Peak Off-State Voltage | VRRM | 440 | - | - | V | I = 0, Tj = 25掳C |
| On-State Voltage | VT | - | 1.4 | - | V | IT(RMS) = 12 A, Tj = 25掳C |
| Gate Trigger Current | IG(T) | 35 | - | 70 | mA | Tj = 25掳C |
| Holding Current | IH | - | 10 | - | mA | Tj = 25掳C |
| Thermal Resistance, Junction to Case | R胃JC | - | 1.0 | - | 掳C/W | - |
| Operating Temperature Range | Tj | -40 | - | 125 | 掳C | - |
| Storage Temperature Range | Tstg | -40 | - | 125 | 掳C | - |
Instructions for Use:
Mounting:
- Ensure proper heat sinking to maintain junction temperature within specified limits.
- Use thermal compound between the device and heat sink for better thermal conductivity.
Gate Drive:
- Apply a gate trigger current (IG(T)) of at least 35 mA to ensure reliable turn-on.
- The gate should be driven with a pulse width sufficient to fully turn on the device.
Current Handling:
- Do not exceed the RMS on-state current (IT(RMS)) of 12 A to avoid overheating.
- For short-term peak currents, ensure they do not exceed 60 A and are limited to 10 ms with a duty cycle less than 1%.
Voltage Handling:
- The device can handle a repetitive peak off-state voltage (VDRM) of 400 V and a non-repetitive peak off-state voltage (VRRM) of 440 V.
- Ensure that the applied voltage does not exceed these ratings to prevent breakdown.
Thermal Management:
- Monitor the junction temperature (Tj) to ensure it remains within the operating range of -40掳C to 125掳C.
- Proper cooling is essential to maintain performance and longevity.
Storage:
- Store the device in a dry environment within the storage temperature range of -40掳C to 125掳C.
Handling:
- Handle the device with care to avoid mechanical damage.
- Follow ESD (Electrostatic Discharge) precautions to prevent damage to the sensitive components.
Testing:
- Perform initial testing under controlled conditions to verify correct operation.
- Regularly check the device parameters to ensure they remain within specified limits.
By following these guidelines, you can ensure optimal performance and reliability of the BTA12-400C triac.
(For reference only)View more about BTA12-400C on main site
