TPIC6C596DRQ1

TPIC6C596DRQ1

Category: IC Chips

Specifications
SKU
5313718
Details

BUY TPIC6C596DRQ1 https://www.utsource.net/itm/p/5313718.html
POWER LOGIC 8-BIT SHIFT REGISTER
Parameter Description Value
Device Type Shift Register TPIC6C596DRQ1
Package TSSOP (Thin Small Outline Package) 20-Pin
Operating Voltage Supply Voltage Range 4.5V to 5.5V
Operating Temperature Junction Temperature Range -40°C to +85°C
Storage Temperature Storage Temperature Range -65°C to +150°C
Input Current Maximum Input Leakage Current ±100nA
Output Current Maximum Output Source/Sink Current ±100mA
Propagation Delay Time Typical Propagation Delay Time 35ns
Power Dissipation Total Power Dissipation 375mW
Data Rate Maximum Data Rate 50MHz

Instructions for Use:

  1. Power Supply Connection: Connect the VCC pin to a stable power supply within the operating voltage range (4.5V to 5.5V). Ensure the GND pin is properly grounded.

  2. Signal Inputs: Apply input signals to the data input pins (D0-D7). These should be TTL/CMOS compatible levels.

  3. Clock Signal: Provide a clock signal to the shift register's clock input (CP) to synchronize data shifting operations.

  4. Output Handling: The outputs (Q0-Q7) can source or sink up to 100mA each. Ensure external circuits connected to these outputs do not exceed this current limit.

  5. Thermal Management: Keep the junction temperature within the specified range (-40°C to +85°C) to ensure reliable operation. If necessary, use heatsinks or other cooling methods.

  6. Storage Conditions: When not in use, store the device in an environment that maintains temperatures between -65°C and +150°C.

  7. Handling Precautions: Handle with care to avoid static damage. Use proper ESD protection measures when handling the component.

  8. Propagation Delay Consideration: Account for the typical propagation delay time of 35ns in your timing calculations to ensure accurate data transfer.

  9. Data Rate Limitations: Operate the device within its maximum data rate of 50MHz to prevent data corruption or loss.

  10. Testing and Verification: After installation, verify all connections and functionality through testing to ensure the device operates as expected.

(For reference only)

View more about TPIC6C596DRQ1 on main site