NVP2010

NVP2010


Specifications
SKU
7959354
Details

BUY NVP2010 https://www.utsource.net/itm/p/7959354.html

Parameter Description
Supply Voltage (VDD) Operating voltage range: 2.7V to 5.5V
Input Voltage Range Differential input voltage range: ±200mV
Output Voltage Swing Rail-to-rail output swing, dependent on load and supply voltage
Bandwidth Unity-gain bandwidth: 1MHz
Slew Rate Minimum slew rate: 0.6V/μs
Quiescent Current Typical quiescent current: 400μA
Common-Mode Rejection Ratio (CMRR) Minimum CMRR: 80dB at DC
Power Supply Rejection Ratio (PSRR) Minimum PSRR: 90dB at 1kHz
Operating Temperature Range Extended industrial temperature range: -40°C to +85°C

Instructions for Use

  1. Power Supply Connections:

    • Connect the positive supply voltage (VDD) and ground (GND). Ensure that the supply voltage is within the specified operating range.
  2. Input Signal Connections:

    • Connect the differential input signals to the IN+ and IN- pins. The input voltage should not exceed the specified differential input voltage range.
  3. Output Configuration:

    • The output pin (OUT) can be connected directly to a load or further stages of amplification. Ensure that the load impedance is compatible with the output drive capability of the NVP2010.
  4. Decoupling Capacitors:

    • Place decoupling capacitors close to the power supply pins to reduce noise and transient effects. A typical value is 0.1μF ceramic capacitor.
  5. Stability Considerations:

    • The NVP2010 is unity-gain stable. However, if used in applications requiring higher stability margins, consider adding compensation components as per application requirements.
  6. Thermal Management:

    • Ensure adequate heat dissipation by providing a proper PCB layout and possibly heatsinks if operating near the maximum temperature limit.
  7. Handling Precautions:

    • Handle the device with care to avoid electrostatic discharge (ESD) damage. Use appropriate ESD protection measures during assembly and handling.
  8. Testing and Validation:

    • After installation, verify the operation of the circuit under expected conditions. Perform tests to ensure that all parameters are within specifications.
(For reference only)

View more about NVP2010 on main site